For SaleFor sale
220 Crimson Ridge Place NW
220 Crimson Ridge Place NW
$835,000
MLS® A2317608
3
Bedrooms
3
Bathrooms
1,991
Area (sqft)
2023
Year Built
4
Parking
2
Garage
Description
Welcome to this stunning home in the highly desirable community of Crimson Ridge, where luxury living meets the beauty of nature. Ideally positioned backing onto scenic walking paths and the renowned Lynx Ridge Golf Course, this exceptional property offers peaceful views and a serene setting just minutes from city amenities.
Boasting nearly 2000 sq. ft. of developed living space, this thoughtfully designed home features an open-concept layout enhanced by quality craftsmanship and contemporary finishes throughout. The main level showcases a spacious great room, a bright dining area, and a beautifully appointed kitchen complete with quartz countertops, stylish cabinetry, a gas range, and a full stainless steel appliance package. A versatile flex room provides the perfect space for a home office, study, or additional bedroom.
Upstairs, you'll find two generously sized bedrooms, a central bonus room, and a convenient laundry room. The elegant primary retreat offers a spacious walk-in closet and a spa-inspired 5-piece ensuite with dual vanities, a freestanding soaker tub, and a separate glass shower.
The large unfinished basement is ready for your vision, featuring open layout and with potential for a 2-bedroom development (subject to required permits and approvals)
Outdoor living is equally impressive, featuring a welcoming covered front patio and a rear deck overlooking the natural surroundings. Additional highlights include 9-foot ceilings, 8-foot doors on the main floor, and exceptional attention to detail throughout.
This is a great opportunity to own a home in one of Calgary’s most sought-after communities, offering the perfect balance of comfort, style, and location.
Boasting nearly 2000 sq. ft. of developed living space, this thoughtfully designed home features an open-concept layout enhanced by quality craftsmanship and contemporary finishes throughout. The main level showcases a spacious great room, a bright dining area, and a beautifully appointed kitchen complete with quartz countertops, stylish cabinetry, a gas range, and a full stainless steel appliance package. A versatile flex room provides the perfect space for a home office, study, or additional bedroom.
Upstairs, you'll find two generously sized bedrooms, a central bonus room, and a convenient laundry room. The elegant primary retreat offers a spacious walk-in closet and a spa-inspired 5-piece ensuite with dual vanities, a freestanding soaker tub, and a separate glass shower.
The large unfinished basement is ready for your vision, featuring open layout and with potential for a 2-bedroom development (subject to required permits and approvals)
Outdoor living is equally impressive, featuring a welcoming covered front patio and a rear deck overlooking the natural surroundings. Additional highlights include 9-foot ceilings, 8-foot doors on the main floor, and exceptional attention to detail throughout.
This is a great opportunity to own a home in one of Calgary’s most sought-after communities, offering the perfect balance of comfort, style, and location.
Features
- No Smoking Home
- Open Floorplan
- Quartz Counters
- See Remarks
- Vaulted Ceiling(s)
- Other
- Dishwasher
- Garage Control(s)
- Gas Range
- Microwave
- Refrigerator
- Washer/Dryer
- Carpet
- Tile
- Vinyl Plank
- Forced Air
- Natural Gas
- None
- Double Garage Attached
- Asphalt Shingle
- Vinyl Siding
Essential Information
- MLS® #
- A2317608
- Property Type
- Residential
- Property Sub Type
- Detached
- Style
- 2 Storey
- Levels
- Two
- Year Built
- 2023
- Full Bathrooms
- 3
- Days on Market
- 38
- Title
- Fee Simple
Community
- Community
- Haskayne
- District
- CAL Zone NW
- Postal Code
- T3L 0K7
- County
- Calgary
- Community Features
Location
Mortgage estimate
Estimates only. Actual rates and payments may vary based on lender, credit, and property type.
Similar properties
Listed by Nevena Stankovic, URBAN-REALTY.ca · MLS® A2317608. Listing data provided by Pillar 9™. Information deemed reliable but not guaranteed.



